Completed Contracts Page 1
Recent Contracts Completed By Joseph Gallagher
Below, and on the following pages are a sample of contracts that Joseph Gallagher have recently completed. For more details on any individual contracts, simply click on the contract you are interested in.
Eden House - Bishopsgate
Located in a very confined location with restricted access, the logistics had to be well organised and documented on a daily basis.
Woolwich Line Enclosure Stratford
The pile caps were excavated and the piles (approx. 700) reduced using a hydraulic cropper.
Forde Avenue Shaft
The works consisted of a 25m id shaft for use as a storm holding tank. The shaft was constructed by jacked caisson method using pcc segmental rings.
Vantage Tower Elephant & Castle
Construction of a residential sub-structure package which included a live Thames Water sewer diversion
West Ham Bus Depot
The West Ham Bus Depot provides parking, maintenance and fuelling facilities for 250 London buses.
Jacked Caissons Lewes
Construction of 6 shafts sunk through the alluvial deposits into the competent water bearing chalk of strengths up to 10kPa.
Pitt Street London W8
The scheme consisted of a split level basement construction for a new luxury house in Kensington W8.
SIS DLR Box
The contract was to carry out the bulk excavation to accommodate the new Docklands Light Railway.
Department Store - London
The Company has a long history of working in testing conditions in buildings of significant national importance.
Wayside Ventilation Works
The Contract used NATM tunnelling techniques under sensitive structures without ground stabilization.