Completed Contracts Page 1

Recent Contracts Completed By Joseph Gallagher

Below, and on the following pages are a sample of contracts that Joseph Gallagher have recently completed. For more details on any individual contracts, simply click on the contract you are interested in.

Eden House - Bishopsgate

Eden House - BishopsgateLocated in a very confined location with restricted access, the logistics had to be well organised and documented on a daily basis.

Woolwich Line Enclosure Stratford

Woolwich Line Enclosure StratfordThe pile caps were excavated and the piles (approx. 700) reduced using a hydraulic cropper.

Forde Avenue Shaft

Forde Avenue ShaftThe works consisted of a 25m id shaft for use as a storm holding tank. The shaft was constructed by jacked caisson method using pcc segmental rings.

Vantage Tower Elephant & Castle

Vantage Tower Elephant & CastleConstruction of a residential sub-structure package which included a live Thames Water sewer diversion

West Ham Bus Depot

West Ham Bus DepotThe West Ham Bus Depot provides parking, maintenance and fuelling facilities for 250 London buses.

Jacked Caissons Lewes

Jacked Caissons LewesConstruction of 6 shafts sunk through the alluvial deposits into the competent water bearing chalk of strengths up to 10kPa.

Pitt Street London W8

Pitt Street London W8The scheme consisted of a split level basement construction for a new luxury house in Kensington W8.

SIS DLR Box

SIS DLR BoxThe contract was to carry out the bulk excavation to accommodate the new Docklands Light Railway.

Department Store - London

Department Store - LondonThe Company has a long history of working in testing conditions in buildings of significant national importance.

Wayside Ventilation Works

Wayside Ventilation WorksThe Contract used NATM tunnelling techniques under sensitive structures without ground stabilization.