Joseph Gallagher has been providing Reinforced Concrete works for many years with experience of completing many complex infrastructure projects in London. We offer a variety of reinforced concrete solutions, such as, RC frames, basements, ground floor slabs, retaining walls and other associated works.
We are able to create basement living spaces by lowering foundations through underpinning. We have extensive experience in a variety of projects.
Joseph Gallagher carries out various small and large groundworks and enabling projects for national and regional contractors across the UK.
Extensions, partial demolitions, structural alterations and change of use means buildings are continually changing and we have been involved in many contracts within the London Area. Joseph Gallagher has worked in many high profile locations such as, The Royal Albert Hall, The British Museum, Somerset House and private developments in Sloane Square.
Joseph Gallagher has been contracted to work with principle contractor Berkley Homes on Phase 5 of Kidbrooke Village, Medrian Gate, located within Kidbrooke Village between Castor Park and Sutcliffe Park.
Chelsea Creek is St George new prestigious dockside development in a stunning location by Chelsea Harbour.
An exclusive collection of Elite and penthouse apartments, located 150m from 2 underground stations.
Howick Place is an award-winning 143,000sq ft. landmark of grade A office space and 23 luxury residential apartments, in the heart of Victoria's expanding cultural quarter.
Kew Bridge is a four phase development in West London, including design and build of a substructure, superstructure and adjacent public house.
The construction of a reinforced concrete box around a live running track, which allowed the Westfield Shopping Centre to be built over and around the line.
To construct the foundations, drainage, substructure and nine storey superstructure for a luxury riverside development in West London.
An exclusive 11 phase development that commenced in the summer of 2000 and now in 2016, the 13acre site is nearing completion.