MENU

Strood Tunnel

Tunnel Works //

Other Specialist Works

The Company has carried out many heading contracts using hand techniques. These have been constructed in ground conditions varying from granular deposits to soft rock. The Company has also constructed a number of hand dug piles where access to piling rigs is restricted or unavailable. These have ranged from 1.5m to 3.0m dia. with bell outs up to 8m and depths up to 40m.

Tunnel Refurbishment and Waterproofing

As part of its tunnel works, the Company is involved in leak sealing and concrete replacement and finishing works.

Box Culvert Jacking

The Company has been involved in the jacking of box culverts for many years.