99 HDD crossings included major roads, rivers, canals, ditches, dykes and SSSI as well as drilling in different ground conditions.
JTS were initially invited by the Coal Authority to provide a report to determine the feasibility of installing a mine-water discharge pipe some 500m into the North Sea near Sunderland.