Erskine Bridge | HDD The Murphy and Joseph Gallagher Teams used Horizontal Directional Drilling (HDD) and Microtunnelling to overcome several challenges on the project to install the new pipeline Expertise, Johnston Trenchless Solutions, Tunnelling
Haywards Heath Drainage Joseph Gallagher were contracted by BAM Nuttal to complete shafts and Microtunnelling as part of the new drainage infrastructure for Network Rail. Design, Expertise, Tunnelling
Tolmount Gas Pipeline Joseph Gallagher were contracted to design and build the temporary and permanent works for a drive shaft and 146m long microtunnel, as part of the Tolmount Gas Pipeline. Civil Engineering, Design, Expertise, Tunnelling
A13 National Grid Gas Diversion Joseph Gallagher were contracted by Fastflow to undertake diversion works on a high-pressure gas main for National Grid. Civil Engineering, Client, Design, Expertise, Fastflow, Johnston Trenchless Solutions, Tunnelling
A13 Widening Project The A13 Road Widening Project is being delivered by Kier on behalf of Thurrock Council. The works include adding an additional lane in both directions between Orsett and Stanford-le-Hope and replacing four bridges. Client, Design, Expertise, Johnston Trenchless Solutions, Kier, Tunnelling
White Hart Lane Joseph Gallagher installed a new pedestrian underpass through the existing viaduct allowing access to both sides of the railway, easing congestion and providing step-free access for passengers. Client, Design, Expertise, Taylor Woodrow, Tunnelling
Tideway | Kitrling Street Site Joseph Gallagher were contracted to construct the launch tunnels for the two Central Section Tunnel Boring Machines. Client, Expertise, Ferrovial Laing O'Rourke, Tunnelling
Knightsbridge Station Step Free Access Construction of passageways using Traditional Squareworks, permanent works consisting of steel frames encased in concrete or reinforced concrete. Client, Design, Expertise, London Underground, Tunnelling
Humber Pipeline The River Humber Gas Pipeline Replacement Project is a £100m design and build contract issued by National Grid to replace the Feeder 9 high pressure gas pipeline under the River Humber. Client, Design, Expertise, Skanska, Tunnelling