West Ruislip

A pipeline of skilled labour, around the clock, supporting the delivery of 8km of twin-bore segmental tunnelling for HS2

Sector:
Rail
Client:
HS2
Main Contractor:
Skanska, Costain. Strabag joint venture
Location:
London

Contact usTo hear about our experiences and how we can help you.

Scope of works

At West Ruislip, we provided and managed a workforce of 560 people, working 24/7, 365 days a year over a three-year period to support the delivery of 8km of twin-bore segmental tunnel for HS2.

Our scope included labour provision for two EPB Herrenknecht TBMs, cross passage excavation, sprayed concrete lining (SCL) works, and secondary lining.

The Main Works Civils Contracts (MWCCs) cover the whole of Phase One, from London to Birmingham. For the MWCCs, four joint ventures have been appointed of which SCS JV (Skanska Construction UK Limited, Costain Limited, STRABAG AG - UK Branch joint venture) has been awarded Area South (S1 and S2 sectors), which covers the length of the planned route from London Euston out to the Harvil Road (West Ruislip).

JGL works at West Ruislip

To hear about our experiences and how we can help you.

Explore related content

Tunnelling and Underground Works

Operative walking through tunnel

Services

Specialists in tunnelling and underground engineering, delivering safe, precise excavation, ground support, and subsurface infrastructure solutions.

Civil and Structural Works

250620 JGL Finham 604

Services

Specialists in civil and structural works, delivering safe, precise construction, reinforced concrete, steel structures, and infrastructure solutions.

Specialist Labour

Services

Delivering skilled, safe, and precise workforce solutions for complex construction, tunnelling, and infrastructure projects.