Project Overview

Joseph Gallagher Ltd successfully delivered a storm overflow bypass pipeline at Budds Farm Wastewater Treatment Works, enabling the construction of a new 5,000 m³ storm storage tank for Southern Water. The bypass pipeline was a critical enabling work, allowing the main storm tank construction to proceed without disrupting existing wastewater operations at a live treatment facility.

Our Approach

The project was delivered through careful planning, effective resource deployment, and close coordination with the client and other contractors working on site. Despite the highly constrained working environment and the presence of multiple subcontractors operating simultaneously, the Joseph Gallagher team maintained excellent standards of safety, quality, and environmental performance throughout.

An experienced and professional workforce was assigned to the scheme, ensuring:

  • Safe delivery of all works
  • A positive site presence and strong stakeholder relationships
  • No impact on neighbouring residents, with complaints successfully avoided

All pipeline crossings were completed on programme, without disrupting the works of other contractors or affecting Southern Water’s operational requirements.

Challenges

The project presented several technical and logistical challenges, including:

  • Very restricted working areas within a live treatment works
  • Multiple contractors operating concurrently in close proximity
  • High groundwater levels, influenced by a tidal river
  • Poor site security, increasing exposure to theft
  • High staff turnover, requiring careful management to maintain continuity

These challenges were successfully mitigated through strong site leadership, clear communication, and collaborative working practices.

Added Value

Joseph Gallagher Ltd provided additional value by supporting the redesign of the storm overflow system, improving its hydraulic efficiency and overall performance. This collaborative input enhanced the functionality of the final scheme while supporting Southern Water’s long‑term operational objectives.

Joseph Gallagher Ltd at Budds Farm WTW

To hear about our experiences and how we can help you.

Explore related content

Civil and Structural Works

250620 JGL Finham 604

Services

Specialists in civil and structural works, delivering safe, precise construction, reinforced concrete, steel structures, and infrastructure solutions.

Design and Engineering

Services

Experts in specialist plant and equipment providing safe deployment, operation, and maintenance of advanced machinery for complex infrastructure works

Ground Improvement and Enabling Works

Services

Specialists in ground improvement and enabling works, delivering safe site preparation, remediation, utilities, drainage and construction readiness.