London Power Tunnels
- Sector:
- Energy
- Client:
- Hochtief &Murphy Joint Venture (HMJV)
- Main Contractor:
- HS2
- Location:
- London Power Tunnels 2 (LPT2) – National Grid
Contact usTo hear about our experiences and how we can help you.
Project Description
The London Power Tunnels 2 project is a major National Grid infrastructure programme aimed at upgrading London’s electricity transmission network through a new 32 km system of deep cable tunnels, constructed beneath the capital.
Joseph Gallagher Ltd was selected to provide specialist labour supply packages and deliver contracted shaft works at several strategic sites. JGL supported two major TBM drives and six shaft locations, ensuring HMJV maintained programme milestones across the multi-phase tunnelling works.
Joseph Gallagher Ltd often achieved record-breaking advance rates of 50 meters in a 24 hour period whilst ensuring a top-quality end product was achieved in a safe manner.
Scope of Works Delivered by Joseph Gallagher Ltd
Joseph Gallagher Ltd’s involvement covered a combination of labour supply and direct contracted works, depending on the operational requirements at each location.

TBM Labour Supply Packages
Kings Avenue TBM
JGL supplied specialist tunnelling labour to support the construction, operation, and maintenance of the Kings Avenue TBM, including:
- TBM Operators
- Miners and Ring Builders
- Locomotive Operators
- Full TBM Mining and pit bottom Chargehands
- Shift Supervisors & Pit Bosses
Hurst TBM Drive
A second major labour provision supported the Hurst TBM, where JGL provided:
- Full tunnelling crews for day and night shifts
- Experienced miners crews and TBM operators
Shaft Works Support – Labour Supply & Contracted Delivery
Joseph Gallagher Ltd played an essential role in the construction and operational support of key LPT2 ventilation and access shafts:
- New Cross Shaft
- Eltham Shaft
- Hurst Shaft
- Bengeworth Road Shaft
- Kidbrooke Shaft
Labour Supply Package
- Full tunnelling teams and lifting crews
- Mining crews and SCL teams
- Fitters/Electricians for plant and equipment
- Multi-skilled shaft operatives
- Operative supply for shaft excavation works
- Structural and civils support
- Lifting, slinging, and logistics teams
- Safety supervision and site support operatives
Across all shafts, Joseph Gallagher Ltd provided 24/7 cover along with supervision, and integrated planning with HMJV management teams. Joseph Gallagher Ltd supplied over 80 highly skilled tunnelling and shaft operatives, each with validated competencies for deep shaft and TBM operations. A Joseph Gallagher Ltd resource manager worked directly with HMJV’s construction leads to forecast labour requirements, manage shift patterns, and respond to unplanned changes.
Award-Winning Behavioural Safety – LIFE programme Joseph Gallagher’s prides itself on their LIFE behavioural safety programme where we bring a workforce that’s embedded into a industry-leading culture.
Joseph Gallagher Ltd is able to seamlessly integrate its LIFE programme in a synergistic way with any behavioural programmes the project is operating to further enhance the project. Joseph Gallagher Ltd's labour contributed to high advance rates on the Kings Avenue and Hurst TBM drives, supporting HMJV’s ability to meet critical tunnelling milestones. There is a strong focus on safety and programme on every project. The Hurst TBM drive accounted for 2.5 months of the tunnelling programme.
Joseph Gallagher Ltd played a crucial role in the successful delivery of the London Power Tunnels 2 project, supporting both major TBM drives and a series of complex deep shafts for the Hochtief &Murphy Joint Venture. By providing a highly skilled, safety-focused, and flexible workforce that combined with direct contracted shaft packages Joseph Gallagher Ltd was able to help HMJV deliver one of London’s most significant underground infrastructure programmes safely and efficiently, whilst delivering a top notch end product to the client.
To hear about our experiences and how we can help you.
Explore related content
Tunnelling and Underground Works
Specialists in tunnelling and underground engineering, delivering safe, precise excavation, ground support, and subsurface infrastructure solutions.
Shaft Sinking
Experts in shaft sinking, delivering safe, precise vertical excavation, ground support, lining installation, and deep access infrastructure solutions.
Civil and Structural Works
Specialists in civil and structural works, delivering safe, precise construction, reinforced concrete, steel structures, and infrastructure solutions.
Specialist Plant and Equipment
SPA and NRC are experts in lifting and plant solutions, providing safe, precise deployment, operation and maintenance of advanced machinery.
Specialist Labour
Delivering skilled, safe, and precise workforce solutions for complex construction, tunnelling, and infrastructure projects.
Ground Improvement and Enabling Works
Specialists in ground improvement and enabling works, delivering safe site preparation, remediation, utilities, drainage and construction readiness.