Scope of Works
The project scope comprised:
- Delivery of two HDD crossings beneath Atlas Road
- Installation of multiple utility pipelines to support essential services
- Execution of precision drilling operations in constrained conditions
- Management and removal of drilling by-products, including slurry
The completed works covered a total drive length of 408m, including:
- Bore 1: 250mm and 110mm pipelines
- Bore 2: Two 250mm pipelines and two 110mm pipelines
Outcome
The Atlas Road scheme demonstrates the effectiveness of Horizontal Directional Drilling in delivering critical utility infrastructure within urban environments.
By combining technical expertise, specialist equipment, and a collaborative approach, Joseph Gallagher successfully completed the installation while maintaining the integrity of the surrounding area.