Project Overview

The £4.2bn Thames Tideway Tunnel project is the largest sewer improvement scheme undertaken in the UK for over a century.

The 25 km tunnel runs beneath the River Thames, connecting 34 existing combined sewer overflows owned and operated by Thames Water.

The Kirtling Street site, located on the south bank of the River Thames, forms part of the central and largest section of the Tideway project (£746m).

Joseph Gallagher Ltd was contracted to construct the launch tunnels for the two Central Section Tunnel Boring Machines.

Scope of Works

The project comprised:

  • Construction of 2 no. SCL tunnels, each 10 m internal diameter and 37 m long
  • Construction of 2 no. reinforced concrete portal frames (20 m × 16 m)
  • Installation incorporating approximately 280 tonnes of steel reinforcement
  • TBM launch enabling works, including launch rails and shove frames

The enabling works were delivered concurrently with the SCL tunnelling package, providing a significant programme benefit.

Challenges

Key challenges included the delivery of substantial underground structures within a constrained programme, requiring mobilisation of a large workforce operating 24 hours a day, seven days a week, across eight SCL gangs.

The works were constructed deep within the Lambeth Group, presenting highly variable ground conditions and unpredictable water ingress. Robust training, induction, and briefing processes were essential to maintaining safety and quality standards.

Delivery & Outcome

Through careful planning and collaborative working, the project was completed one week early, while maintaining high standards of safety and quality. A strong working relationship with FLO JV supported effective communication and delivery throughout the project lifecycle.

“Joseph Gallagher Site Management were open and honest, providing information and responding well to issues that occurred. They were always in attendance in the daily briefings (days and nights).”

Alan Hughes

FLO H&S Manager

To hear about our experiences and how we can help you.

Explore related content

Tunnelling and Underground Works

Operative walking through tunnel

Services

Specialists in tunnelling and underground engineering, delivering safe, precise excavation, ground support, and subsurface infrastructure solutions.

Civil and Structural Works

250620 JGL Finham 604

Services

Specialists in civil and structural works, delivering safe, precise construction, reinforced concrete, steel structures, and infrastructure solutions.

Design and Engineering

Services

Experts in specialist plant and equipment providing safe deployment, operation, and maintenance of advanced machinery for complex infrastructure works

Specialist Plant and Equipment

Specialist Plant and Equipment

Services

SPA and NRC are experts in lifting and plant solutions, providing safe, precise deployment, operation and maintenance of advanced machinery.

Environmental and Sustainability Services

Services

Delivering low impact, eco-conscious solutions that protect the environment in infrastructure, enhancing sustainability and regulatory compliance.

Ground Improvement and Enabling Works

Services

Specialists in ground improvement and enabling works, delivering safe site preparation, remediation, utilities, drainage and construction readiness.