Project Overview

Joseph Gallagher Ltd (JGL) delivered a precision auger bore crossing at Picton Lane as part of the Liverpool Bay Carbon Capture Storage (CCS) Project. Working in partnership with United Infrastructure, the team successfully installed a 36” steel pipeline beneath challenging clay ground conditions.

Despite tight programme constraints, the crossing was completed safely, on time, and within budget, demonstrating JGL’s expertise in delivering complex trenchless solutions for critical infrastructure.

Project Highlights

  • 31.5 m auger bore drive completed
  • Installation of 36” steel product pipe
  • Delivered within a 5-day construction window
  • Zero non-conformities and strong safety performance
  • Efficient spoil management and minimal surface disruption

Our Approach

JGL adopted a collaborative, safety-first approach, working closely with the main contractor to integrate trenchless activities into the wider programme.

Using specialist auger boring equipment, the team maintained precise control of alignment and ground conditions, ensuring accurate installation while protecting surrounding infrastructure. Careful planning, daily coordination, and experienced operatives enabled smooth delivery with no delays.

Challenges

The project presented challenges including soft clay ground conditions, restricted working space, and a compressed timescale. These were successfully managed through controlled installation techniques, detailed planning, and effective collaboration across all parties.

Added Value

JGL’s in-house expertise and specialist equipment ensured efficient delivery first time, reducing risk and supporting the client’s overall programme. The trenchless method also minimised disruption to the surrounding area.

Sustainability

The use of auger boring significantly reduced environmental impact compared to traditional open-cut methods, limiting surface disturbance and supporting responsible material management.

JGL Auger Crossing works

To hear about our experiences and how we can help you.

Explore related content

Tunnelling and Underground Works

Operative walking through tunnel

Services

Specialists in tunnelling and underground engineering, delivering safe, precise excavation, ground support, and subsurface infrastructure solutions.

Shaft Sinking

Services

Experts in shaft sinking, delivering safe, precise vertical excavation, ground support, lining installation, and deep access infrastructure solutions.

Civil and Structural Works

250620 JGL Finham 604

Services

Specialists in civil and structural works, delivering safe, precise construction, reinforced concrete, steel structures, and infrastructure solutions.

Design and Engineering

Services

Experts in specialist plant and equipment providing safe deployment, operation, and maintenance of advanced machinery for complex infrastructure works

Specialist Plant and Equipment

Specialist Plant and Equipment

Services

SPA and NRC are experts in lifting and plant solutions, providing safe, precise deployment, operation and maintenance of advanced machinery.

Specialist Labour

Services

Delivering skilled, safe, and precise workforce solutions for complex construction, tunnelling, and infrastructure projects.

Environmental and Sustainability Services

Services

Delivering low impact, eco-conscious solutions that protect the environment in infrastructure, enhancing sustainability and regulatory compliance.

Ground Improvement and Enabling Works

Services

Specialists in ground improvement and enabling works, delivering safe site preparation, remediation, utilities, drainage and construction readiness.