99 HDD crossings included major roads, rivers, canals, ditches, dykes and SSSI as well as drilling in different ground conditions.
Construction of a new sub-station within a small footprint site.
Joseph Gallagher were contracted by BAM Nuttal to complete shafts and Microtunnelling as part of the new drainage infrastructure for Network Rail.
Joseph Gallagher were contracted to design and build the temporary and permanent works for a drive shaft and 146m long microtunnel, as part of the Tolmount Gas Pipeline.
Joseph Gallagher were contracted by Fastflow to undertake diversion works on a high-pressure gas main for National Grid.
Joseph Gallagher were appointed to carry out works for creating a new effluent system named “Project Ginger” for AG Barr the makers of the famous Irn Bru.
Joseph Gallagher have won Contractor of the Year, concurrently for two years on this project transforming an old gas works site into a luxury development - Southall Waterside.
The A13 Road Widening Project is being delivered by Kier on behalf of Thurrock Council. The works include adding an additional lane in both directions between Orsett and Stanford-le-Hope and replacing four bridges.
Joseph Gallagher installed a new pedestrian underpass through the existing viaduct allowing access to both sides of the railway, easing congestion and providing step-free access for passengers.
Construction of passageways using Traditional Squareworks, permanent works consisting of steel frames encased in concrete or reinforced concrete.
The River Humber Gas Pipeline Replacement Project is a £100m design and build contract issued by National Grid to replace the Feeder 9 high pressure gas pipeline under the River Humber.