Project Title

Clapham Culvert

Summary

With an excellent track record and delivery on the Tideway project, JGL were appointed to push 30m of pipe beneath the river Thames using the trenchless tunnelling technique of pipe jacking.

Services

Value:
£460,000
Sector:
Tunnelling
Client:
Thames Tideway
Main Contractor:
Ferrovial Laing O'Rourke Joint Venture (FLOJV)
Location:
London
Duration:
14 weeks
  • Pipe successfully pushed beneath the river Thames from one side of Vauxhall Bridge to the other, along the South Bank
  • Excellent workmanship within the Cofferdam - no spills into the Thames given the close proximity of the works
  • Good sound relationship with main contractor - FLOJV and client - Thames Tideway

Contact usTo hear about our experiences and how we can help you.

Project Overview

With an excellent track record and delivery on the Tideway project, JGL were appointed by the main contractor to push 30m of pipe beneath the river Thames using the trenchless tunnelling technique of pipe jacking.

Due to the works being in such close proximity to the river, an open face pipejack shield was manufactured specifically for the project.

Excellent project delivery by the JGL team given the challenges presented. A good sound relationship built with the main contractor and client to ensure all outputs were delivered at the required high standards.

TBM in Cofferdam
TBM used on project
Site Overview
Site overview

Challenges

The biggest challenge on this project was the public's exposure to the works due to its location being next to Vauxhall Bridge. Members of the public could physically see down to the pit bottom of the shaft. This was managed carefully by the team with enhanced pedestrian management processes put into place.

To hear about our experiences and how we can help you.

Explore related content

Microtunnelling

Services

Our SPA subsidiary and it's Iseki Microtunnelling division are the leading providers in tunnelling and hire equipment. With over 30 Iseki machines we can cater for the most complex ground conditions.

Pipe Bursting

Services

We offer the modern option for pipe replacement, pipe-jacking uses the existing pipeline as a guide. It’s non-invasive and fast, cutting the pipeline and simultaneously laying a new pipe in its place.