The client was Welsh Water and as part of the AMP 6 works used Skanska to project manage the scheme with Joseph Gallagher Ltd appointed after a review of the technical issues regarding the works.

An Overview

The client was Welsh Water and as part of the AMP 6 works used Skanska to project manage the scheme with Joseph Gallagher Ltd appointed after a review of the technical issues regarding the works.

The project involved remedial works to the dam to enable the dam to protect the dam structure, allowing the reservoir to be drained and the opening up by removal of the brick plug, of the original tunnel at the base of the dam.  This tunnel was then concrete reinforced lined and a stainless steel top hat arrangement installed at the face of the dam together with a new trash screen base and trash screen at the front.

  • "

    JGL’s professionalism and desire to provide a safe working environment for all involved with the Upper Neuadd project has shone through, JGL have listened and provided invaluable input at varying stages of the construction phase to ensure the project remained focused on the deliverable output

    "

    JON CLEWER

    MANAGING DIRECTOR, UTILGRID LTD - ON BEHALF OF SKANSKA

Would you like us to send you this case study?

By submitting your name and email address you are opting in to receive emails.
For more information on this, read our privacy policy