Anglian Water Covenham to Boston 99 HDD crossings included major roads, rivers, canals, ditches, dykes and SSSI as well as drilling in different ground conditions. Client, Design, Expertise, JN Bentley, Johnston Trenchless Solutions
Erskine Bridge | HDD The Murphy and Joseph Gallagher Teams used Horizontal Directional Drilling (HDD) and Microtunnelling to overcome several challenges on the project to install the new pipeline Expertise, Johnston Trenchless Solutions, Tunnelling
Atlas Road | HDD We have been contracted by UKPN and Clancy Dowcra to design and construct two HDD crossings from Willesden Grid main substation to the new substation on Atlas Road. Expertise, Johnston Trenchless Solutions
Grove Park | HDD We were contracted to undertake six HDD crossings at three locations drilling under Network Rail assets for UKPN and Clancy Dowcra. Each location required two separate bores reamed up to 22inch, with each bore housing nine electric ducts. Expertise, Johnston Trenchless Solutions
A13 National Grid Gas Diversion Joseph Gallagher were contracted by Fastflow to undertake diversion works on a high-pressure gas main for National Grid. Civil Engineering, Client, Design, Expertise, Fastflow, Johnston Trenchless Solutions, Tunnelling
A13 Widening Project The A13 Road Widening Project is being delivered by Kier on behalf of Thurrock Council. The works include adding an additional lane in both directions between Orsett and Stanford-le-Hope and replacing four bridges. Client, Design, Expertise, Johnston Trenchless Solutions, Kier, Tunnelling
Upper Neaudd Reservoir The client was Welsh Water and as part of the AMP 6 works used Skanska to project manage the scheme with Joseph Gallagher Ltd appointed after a review of the technical issues regarding the works. Client, Expertise, Johnston Trenchless Solutions, Skanska
Marmadon Pumping Station This pumping station and associated works was undertaken as a turnkey package for civil and MEICA works. Client, Expertise, Hochtief Murphy JV , Johnston Trenchless Solutions
South West Water Pipe Ram JTS were initially contacted to provide a quote for “directional Drill” river crossing to install a 450mm PE Rising main. Balfour Beatty, Client, Expertise, Johnston Trenchless Solutions